If you live in Shahdara or Dilshad Garden, your rooftop solar vendor depends on which route you take. Homes using up to 400 units a month can get a free 2 kW or 3 kW plant under the Delhi government’s new scheme, and in that case the vendor is assigned to you. Everyone else picks a vendor registered on the PM Surya Ghar portal and still claims the subsidy.
Both areas fall under BSES Yamuna Power Limited (BYPL), so every vendor you deal with has to work through BYPL’s approval and net metering process. Knowing which route you qualify for before you call any vendor saves time and money, and keeps you away from false promises.
Quick Overview
| Question | Free Route (ULA Scheme) | Open Route (PM Surya Ghar) |
|---|---|---|
| Who it suits | Homes averaging up to 400 units/month, 2 kW or 3 kW plant | Homes above 400 units, plants larger than 3 kW, or people who do not want to wait |
| Who picks the vendor | Government-selected vendor allotted to your area | You choose from portal-registered vendors |
| Your cost | Free for eligible homes up to 400 units | Vendor price minus central and state subsidy |
| Where to apply | Delhi Solar Portal | PM Surya Ghar national portal, plus Delhi Solar Portal for the state subsidy |
| DISCOM for both areas | BSES Yamuna Power Limited (BYPL) | |
Which Electricity Company Handles Solar in Shahdara and Dilshad Garden?
BSES Yamuna Power Limited (BYPL) supplies power to Shahdara, Dilshad Garden and the rest of East and Central Delhi. That matters because BYPL checks technical feasibility, approves your connection and installs the bidirectional net meter.
Your 11-digit BYPL CA number from your electricity bill is the first thing any vendor or portal will ask for. Keep a recent bill handy before you start.
BYPL also runs Solarise East, an outreach programme for East Delhi households. It works through RWA meetings, consumer camps, kiosks and workshops. If your RWA in Dilshad Garden or a Shahdara colony hosts a solar camp, it is a good place to meet empanelled vendors face to face and get your eligibility questions answered.
Do You Get to Choose Your Own Solar Vendor in Shahdara?
Only on the open route. On the free route, you do not choose. The Delhi government, through IPGCL, selects vendors by tender, and the vendor working in your BYPL division installs your plant.
The Free Route: Utility-Led Aggregation (ULA)
Under the second amendment to the Delhi Solar Energy Policy 2023, the state subsidy was raised to up to ₹78,000 for systems up to 3 kW. That sits on top of the central PM Surya Ghar subsidy of up to ₹78,000. For homes whose average monthly consumption during FY 2025-26 was up to 400 units, the two together cover the full cost of the plant.
Here is what to expect:
- The plant size is 2 kW or 3 kW.
- You give consent on the Delhi Solar Portal, and the allotted vendor visits your home for a survey.
- Homes that already have more than 1 kW of solar installed are not eligible.
- Homes above 400 units can still apply but pay the balance after subsidy to the vendor.
Status as of November 2026: applications opened on 22 September 2026, but vendor selection was still pending, and home surveys had not started. The government’s target is to finish installations by March 2027. If someone claims to be the “official government vendor” for Dilshad Garden before vendors are announced on the portal, be careful.
The Open Route: PM Surya Ghar With a Vendor You Choose
If your home does not fit the free route, or you want a larger system, you can hire any vendor registered on the PM Surya Ghar portal. You agree on a price, the vendor installs, BYPL fits the net meter, and the subsidy is credited to your bank account after commissioning.
This route suits joint families in Shahdara with high summer bills, homes with heavy AC load, or owners who want 5 kW or more. Keep in mind that the central subsidy stops growing after 3 kW, so the extra capacity is paid in full by you.
Where Can You Find Empanelled Solar Vendors for East Delhi?
Use official lists first and local referrals second. Never rely on a pamphlet or a WhatsApp forward alone.
- Delhi Solar Portal: the Delhi government’s solar portal has an Empanelled Vendors section and the consent link for the free scheme.
- PM Surya Ghar portal: the PM Surya Ghar national portal lists registered vendors. Select Delhi and BSES Yamuna to see vendors who work in your area.
- BYPL: check updates and solar camp notices on the BSES Delhi website, or ask at your local BYPL division office.
- Neighbours and RWAs: ask people in your block who already have solar how quickly their vendor handled the net meter and whether service calls are answered.
A good shortlist has at least three vendors. Two of them should have finished jobs in East Delhi that you can actually go and see.
What Should You Check Before Hiring a Solar Vendor in Shahdara or Dilshad Garden?
Check registration, panel type, written warranties and who handles the BYPL paperwork. Price comes after these.
- Portal registration: confirm the vendor’s name appears on the PM Surya Ghar portal. An unregistered installer can cost you the subsidy.
- DCR panels: subsidy requires domestically manufactured (DCR) solar modules. Ask for the module make and model in writing.
- Five years of free maintenance: central guidelines require five years of free repair and maintenance, plus a five-year system warranty. Make sure the contract says so.
- Inverter details: brand, capacity and warranty period should be written on the quote.
- Structure: ask about structure height, galvanisation and how it will be fixed to your roof without damaging waterproofing.
- Net meter support: the vendor should handle the BYPL application, inspection and meter installation for you.
- Payment schedule: avoid paying the full amount before installation and commissioning.
When the quotes arrive, line them up item by item. This guide to comparing rooftop solar quotations in Delhi shows which line items vendors often leave vague.
What Roof Issues Are Common in Shahdara and Dilshad Garden?
Shared terraces, shading from nearby buildings and crowded rooftops are the issues that most often slow down installations in these areas. A good vendor should spot them at the survey stage, not after installation.
Shared Terraces in DDA Flats
Many Dilshad Garden homes are DDA flats where the terrace is shared or belongs to the top-floor owner. Before you sign anything, sort out who has roof rights. If the terrace is common, get written consent from other owners or the RWA. Disputes after installation are much harder to fix.
Shading in Dense Lanes
Older parts of Shahdara have narrow lanes and buildings of different heights. A taller neighbouring floor, a water tank or a mobile tower can shade panels for part of the day. Ask the vendor to check shading at different times, and consider an elevated structure if the roof gets partial shade.
Space Taken by Tanks and Storage
A 3 kW system usually needs a clear, shadow-free area on the roof. Water tanks, dish antennas and stored items reduce usable space. Measure what is really free before you settle on system size.
Builder Floors and Older Buildings
In builder floors, roof access is usually tied to the top floor. In older houses, ask the vendor to look at roof condition and seepage. Fix waterproofing before panels go up, because lifting panels later costs extra.
How Much Does Rooftop Solar Cost in Shahdara After Subsidy?
For eligible homes using up to 400 units a month, a 2 kW or 3 kW plant under the free route costs nothing. On the open route, you pay the vendor’s price minus the subsidies you qualify for.
The central PM Surya Ghar subsidy is ₹30,000 for 1 kW, ₹60,000 for 2 kW and up to ₹78,000 for 3 kW and above. The revised Delhi policy adds a state subsidy capped at ₹26,000 per kW, up to ₹78,000. Actual amounts depend on your eligibility and installed capacity. For full slab details, read our Delhi solar subsidy explainer.
Vendor prices vary with panel brand, inverter type and structure height. To set a realistic budget, check our breakdown of rooftop solar installation cost for homes in Delhi. If a 3 kW plant is what you have in mind, this guide on the 3 kW rooftop solar system cost after subsidy walks through the numbers.
How Does the Process Work From Application to Net Meter?
The process runs from application to site survey, installation, BYPL inspection, net meter and subsidy credit. Here is the typical order on the open route:
- Register and apply: sign up on the PM Surya Ghar portal with your BYPL CA number, and on the Delhi Solar Portal for the state benefit. Here are the steps to apply for the Delhi solar subsidy online.
- Keep papers ready: electricity bill, Aadhaar, bank details and property or roof-rights proof. See the full list of documents required for the solar subsidy in Delhi.
- Feasibility: BYPL checks whether your connection and local transformer can take the new system.
- Select vendor and install: pick a registered vendor, sign a written agreement and get the plant installed.
- Net metering: the vendor submits the installation details, and BYPL inspects and fits the bidirectional meter. Our guide to the BSES solar net metering application process explains each stage.
- Subsidy credit: after commissioning, upload the required details on the portal. The central subsidy goes to your bank account.
On the free route, you give consent on the Delhi Solar Portal, and the allotted vendor handles the survey and installation once selection is complete. You can follow progress using this guide on how to check your Delhi Solar Portal application status.
What Mistakes Do Homeowners Make When Choosing a Solar Vendor?
- Trusting “free solar” door-to-door claims: the government free scheme uses officially selected vendors only. Verify on the portal first.
- Choosing only on price: a cheap quote with non-DCR panels or a weak structure can lose you the subsidy or need repairs within a few years.
- Skipping roof rights: in shared buildings, missing consent can stall net metering approval.
- Oversizing the system: beyond 3 kW, there is no extra subsidy. Size the system to your actual usage and roof space.
- No written service terms: without the five-year maintenance clause in writing, getting the vendor back for repairs is hard.
- Paying everything upfront: tie the final payment to commissioning and the net meter being installed.
How Do Shahdara Vendors Compare With Other Parts of Delhi?
Most vendors serving East Delhi also work in nearby BYPL areas, so checking neighbouring areas widens your shortlist. If you are open to vendors from close by, see our lists of solar energy companies in Laxmi Nagar and Preet Vihar and rooftop solar installers in Mayur Vihar.
The checks you need are the same across Delhi, but the DISCOM changes. South Delhi homes are usually served by BSES Rajdhani, as covered in our guide to solar panel installation in Lajpat Nagar. In West Delhi, our page on MNRE-empanelled solar vendors in Dwarka covers a different set of local installers.
Frequently Asked Questions
Is rooftop solar really free in Dilshad Garden?
Yes, for eligible residential homes whose average monthly consumption was up to 400 units in FY 2025-26, under the free route for a 2 kW or 3 kW plant. If your usage is higher, you pay the balance after subsidy.
Can tenants in Shahdara install rooftop solar?
Usually only with the owner’s written consent, because the roof and the electricity connection are in the owner’s name. The application has to be made against the CA number on the bill, so the owner normally needs to be involved.
How long does installation take once a vendor is finalised?
Physical installation of a 2 kW or 3 kW system often takes one or two days. Feasibility checks, BYPL inspection and net meter fitting take longer and vary by division workload, so plan for several weeks in total.
What happens if my vendor stops responding after installation?
Raise a complaint on the PM Surya Ghar portal, and inform BYPL if the issue affects your meter or connection. This is why you should keep the signed agreement and warranty papers safe.
Can I add batteries to my system?
You can, but subsidised schemes are designed for grid-connected systems with net metering. Batteries add cost and are not covered by the subsidy, so discuss them separately with your vendor.
Does a flat in a DDA building qualify?
It can, as long as you have the right to use the roof space and the system connects to your own electricity meter. Flats with a common terrace may also suit group housing or community solar options under the Delhi policy.
Final Recommendation
Start by checking your average monthly units on your BYPL bills. If you are at or under 400 units, apply on the Delhi Solar Portal and wait for the officially selected vendor rather than paying a private installer. If you use more power or want a bigger system, shortlist three PM Surya Ghar-registered vendors who work in East Delhi, visit at least one of their finished sites, and compare written quotes line by line before you sign.