Mayur Vihar Phase 1, Phase 1 Extension, Phase 2 and Phase 3 all fall under BSES Yamuna Power Limited (BYPL), so you need a rooftop solar installer who is registered for BYPL on the PM Surya Ghar National Portal and who handles BYPL net metering. Since September 2026, Delhi homes that use up to 400 units a month on average can get a 2 kW or 3 kW system installed at zero upfront cost, and homes above 400 units can get up to ₹1,56,000 in combined central and Delhi subsidy on a 3 kW system.
That single policy change has made most older quotes and blog posts about Mayur Vihar solar out of date. This guide explains which route fits your home, what a fair price looks like, how to check whether an installer is genuine, and what to sort out first if you live in a DDA flat or a group housing society.
Quick Overview
| Question | Short Answer for Mayur Vihar |
|---|---|
| Which DISCOM? | BSES Yamuna Power Limited (BYPL) for Phase 1, Phase 1 Extension, Phase 2 and Phase 3 |
| Who can get free rooftop solar? | Domestic consumers with average use up to 400 units/month (based on FY 2025-26), for 2 kW or 3 kW, subject to roof feasibility |
| Subsidy if you use more than 400 units | Up to ₹78,000 central (PM Surya Ghar) + up to ₹78,000 Delhi state = up to ₹1,56,000 |
| Where to apply | Delhi Solar Portal (solar.delhi.gov.in) for consent and state benefit; PM Surya Ghar National Portal for central subsidy; BYPL for net metering |
| Which installer? | A vendor empanelled for BYPL on the PM Surya Ghar portal, or the vendor allotted under the Delhi scheme |
| Panels required for subsidy | DCR panels (Indian-made cells under ALMM List-II) |
| Net metering timeline | DERC has cut connectivity for home systems up to 10 kW to about 10 days after documents are submitted |
| Free maintenance | 5 years of O&M, including cleaning, from the vendor under the Delhi scheme |
Which Rooftop Solar Installers Serve Mayur Vihar Phase 1, 2 and 3?
Several solar companies have offices inside or right next to Mayur Vihar, which matters because a nearby installer can do site surveys quickly and respond faster to service calls. The firms below appear in local search results for the area. Their addresses are taken from their public listings. Before you sign anything, confirm that the company is listed as an empanelled vendor for BSES Yamuna on the PM Surya Ghar National Portal. That listing, not a Google rating, is what makes you eligible for subsidy.
| Installer | Listed Location | Closest Mayur Vihar Area |
|---|---|---|
| SuryaOne Solartech LLP | B585 & 586, GD Colony, Block B, Mayur Vihar Phase 3, Delhi 110096 | Phase 3, Kondli, Gharoli |
| Solargram (Doorastha Analytics Pvt. Ltd.) | 107-108, Atlantic Plaza, LSC, Mayur Vihar Phase 1, Delhi 110091 | Phase 1, Phase 1 Extension |
| Symbroj Solar Pvt. Ltd. | 32-E, First Floor, Adarsh Mohalla, Awadhpuri, Patparganj, Delhi 110091 | Phase 1, Patparganj side |
| Mavericks Solar Energy Solutions Pvt. Ltd. | Firni Road, Khichripur area, Delhi 110091 | Phase 1, Phase 2 |
| Shiv Shakti Solar Power Systems | 67, Pandav Nagar Main Road, Delhi 110091 | Phase 1 |
| Urbantech Industrial Services | U-74, Block B, Laxmi Nagar, Delhi 110092 | Phase 1, Phase 2 |
| Alien Energy Solar | 91, Kiran Vihar, Karkardooma, Delhi 110092 | All phases |
Large national companies also take orders in Mayur Vihar. They may not have a local office, so ask where the service team that will visit your home is based.
Important Point to be Considered! Under the new Delhi free solar scheme, you do not shop around in the usual way. The vendor is allotted after you give consent on the Delhi Solar Portal. Choosing your own installer mainly matters if you use more than 400 units, want a system above 3 kW, or prefer a specific brand of panels and inverter.
Can You Get Free Rooftop Solar in Mayur Vihar?
Yes, if your home’s average consumption was up to 400 units a month during FY 2025-26 and your roof passes the technical check. The second amendment to the Delhi Solar Energy Policy 2023, approved on 1 September 2026, combines the central ₹78,000 PM Surya Ghar subsidy with a matching ₹78,000 from the Delhi government. If both together still fall short of the tendered plant cost, Delhi adds a top-up so eligible households pay nothing upfront.
Registration opened on the Delhi Solar Portal on 21 September 2026. Allotment is first come, first served, and the first phase covers about 1.10 lakh installations up to 28 February 2027, so applying early helps.
How Does the Benefit Change With Your Monthly Units?
| Your Average Monthly Use | What You Get | What Happens to Your Bill |
|---|---|---|
| 0 to 200 units | Free system up to 3 kW | 100% electricity subsidy continues, plus an energy-saving incentive and payment for surplus units at the APPC rate |
| 201 to 400 units | Free system up to 3 kW | Existing subsidy (up to ₹800/month) continues; the net bill can drop close to zero |
| Above 400 units | Up to ₹78,000 central + up to ₹78,000 state capital subsidy | No bill subsidy at this level; savings come from cheaper installation and net metering |
| Group housing society / RWA common areas | ₹18,000/kW central + up to ₹11,000/kW state | Lower project cost; group or virtual net metering may be used |
A 3 kW system produces roughly 300 units a month on average, which is why 3 kW is the standard size for this scheme.
What Are the ULA and DISCOM Trusteeship Models?
These are the two ways the Delhi scheme pays for your plant. Under Utility Led Aggregation (ULA), both subsidies are adjusted against the plant cost and you pay only the balance, which is zero for eligible homes up to 400 units. Under the DISCOM Trusteeship model, you receive the central subsidy, the Delhi subsidy goes to the vendor, and you pay the vendor the remaining amount. Vendors for both models are selected through a tender run by Indraprastha Power Generation Company Limited (IPGCL).
Pro Tip! Check your average monthly units from your last 12 BYPL bills before you register. If you are close to the 400-unit line, look at the FY 2025-26 figures specifically, since that is the period the scheme uses.
How Much Does Rooftop Solar Cost in Mayur Vihar If You Pay Yourself?
For homes above 400 units, or anyone buying a system through the open market, local quotes for a DCR on-grid system currently work out to roughly ₹60,000 to ₹75,000 per kW before subsidy for small home systems. Published listings for the Mayur Vihar Phase 1 Extension area show 4 kW systems starting around ₹2.52 lakh and 5 kW systems between about ₹3.15 lakh and ₹3.57 lakh. Prices depend on panel brand, inverter, structure height and cable runs.
| System Size | Typical Quote Range (Before Subsidy) | Maximum Combined Subsidy | Approx. Net Cost |
|---|---|---|---|
| 2 kW | ₹1,30,000 to ₹1,50,000 | Depends on the state component for 2 kW (central is ₹60,000) | Confirm on portal |
| 3 kW | ₹1,85,000 to ₹2,20,000 | Up to ₹1,56,000 | About ₹29,000 to ₹64,000 |
| 5 kW | ₹3,15,000 to ₹3,60,000 | Up to ₹1,56,000 (capped at 3 kW) | About ₹1.6 lakh to ₹2 lakh |
These are working ranges from local market quotes, not official prices. The Delhi government’s own worked example shows a 3 kW household using about 500 units a month contributing ₹19,000 after both subsidies under the tendered model, which tells you that the tendered route is often cheaper than open-market buying. For a detailed breakdown of 3 kW pricing, see our guide on 3 kW rooftop solar system cost after subsidy in Delhi.
Important Point to be Considered! The central subsidy is capped at 3 kW. Going from 3 kW to 5 kW adds cost but no extra subsidy, so size the system to your real daytime and annual usage, not to the biggest number a salesperson suggests.
Can You Install Rooftop Solar on a DDA Flat or Society in Mayur Vihar?
Yes, but roof rights decide how. Mayur Vihar has a mix of DDA flats, group housing societies (very common in Phase 1 Extension), and independent or builder floors, and each needs a slightly different approach.
- Top-floor DDA flat with terrace use: Usually the simplest case. You can install an individual system on your own meter. Keep proof of terrace use and talk to neighbours early, because a shared staircase or water tank access can still cause disputes.
- Lower-floor DDA flat with a shared terrace: You will normally need a written no-objection from the other flat owners sharing that roof. Each floor has its own BYPL meter, so each owner can have their own small system if the roof has room.
- Group housing society (CGHS/RWA): Individual flats rarely get a personal roof share. The practical route is a common-area system on the society roof, which gets ₹18,000/kW central plus up to ₹11,000/kW Delhi support, with group or virtual net metering where permitted. This needs a society resolution.
- Independent house or builder floor: Straightforward if you own the roof. Our step-by-step rooftop solar installation process for independent houses in Delhi covers this in detail.
Pro Tip! Older Mayur Vihar DDA blocks often have water tanks, mumtys and dish antennas on the roof. Ask the installer to mark these on the layout drawing and confirm the system is fully shadow-free from 9 AM to 4 PM. Roughly 100 sq ft of clear roof per kW is a useful rule of thumb.
How Do You Apply for Rooftop Solar in Mayur Vihar Step by Step?
The process runs across three systems: the Delhi Solar Portal, the PM Surya Ghar National Portal and BYPL’s net metering system. Here is the order that works for most homes.
- Check your units and roof. Pull your BYPL bills, note your average monthly units and CA number, and confirm you have a shadow-free roof.
- Give consent on the Delhi Solar Portal. Choose the PM Surya Ghar option or the Delhi Solar Energy Policy option. Free installation applies only to eligible homes up to 400 units.
- Register on the PM Surya Ghar National Portal at pmsuryaghar.gov.in if you are claiming the central subsidy, and select BSES Yamuna as your DISCOM.
- Apply for net metering with BYPL. Your vendor usually files this for you.
- Site visit and feasibility. The allotted or chosen vendor checks your roof, load and structure.
- Installation. Panels, inverter, structure, earthing and safety devices are installed.
- Inspection and net meter. BYPL inspects the system and installs the net meter.
- Subsidy release. The subsidy is routed as per the model you chose. Track it through the Delhi Solar Portal application status check.
If you want screenshots of each portal step, our guide on how to apply for solar subsidy in Delhi online walks through it.
How Long Does BYPL Net Metering Take in Mayur Vihar?
For home systems up to 10 kW, the Delhi Electricity Regulatory Commission has amended its net metering rules so that document checks, site inspection, net meter installation and connectivity happen as one stage within 10 days of submitting complete documents. Where a technical assessment is needed, the combined timeline is capped at 25 days. Delhi has also waived registration fees for home systems up to 10 kW.
You still pay for the net meter itself. BYPL auto-debits applicable net meter charges to your electricity bill, while the DISCOM bears the cost of the solar generation meter. Any surplus units left over at settlement are paid at the Average Power Purchase Cost (APPC) rate.
For BYPL-specific queries, the BYPL renewable energy page lists a solar net metering helpline (011-41247068, 41247031, 41247953). The full paperwork list is in our guide to documents required for solar net metering in Delhi.
Important Point to be Considered! Do not let an installer start fixing the structure before BYPL has given technical feasibility, unless you are under the Delhi scheme and the vendor has been allotted through the portal. Plants installed ahead of approval are a common reason for delays.
How Do You Check If a Mayur Vihar Solar Installer Is Genuine?
A genuine installer for subsidy work will be empanelled for BSES Yamuna on the PM Surya Ghar portal, will use DCR panels, and will give you a written, itemised quote. Use this checklist before paying any advance.
- Portal empanelment: Search the vendor list on the PM Surya Ghar portal with Delhi and BSES Yamuna selected.
- DCR certificate: From 1 June 2026, panels on PM Surya Ghar subsidy projects must use cells from ALMM List-II. Vendors now generate a DCR certificate per customer and enter its 16-digit number on the National Portal. Ask for that number.
- Itemised quote: Panel make and wattage, inverter make and capacity, structure type and height, cable sizes, earthing, lightning arrester, ACDB/DCDB and monitoring.
- Warranty and O&M in writing: Under the Delhi scheme, vendors must provide five years of free all-inclusive maintenance, including panel cleaning and fault repairs.
- Local reference: Ask for one or two completed installations in Mayur Vihar or nearby Patparganj, Pandav Nagar or Kondli that you can see.
- Paperwork handling: The vendor should file the BYPL net metering application and upload the installation documents for you.
Comparing two or three quotes side by side catches most problems. Our checklist on how to compare rooftop solar quotations in Delhi shows what to look for line by line.
Pro Tip! If a seller offers cheap non-DCR panels “with full subsidy”, walk away. Non-DCR panels are only allowed if you choose the “Give It Up” option and forgo the central subsidy, and that exemption runs only until 31 March 2027.
How Much Will Solar Save on a BYPL Bill in Mayur Vihar?
On a clear sunny day, a 1 kW plant in Delhi generates about 4 to 5.5 units, according to BSES. Averaged across the year, a 3 kW system gives roughly 300 units a month. For a household using 300 units, that can bring the net bill close to zero. For a household using 500 units, the Delhi government’s own example shows the bill falling from about ₹3,236 to ₹1,094 a month.
East Delhi winters bring smog and dust, especially from late October to January, and generation drops during those weeks. Summer months more than make up for it under annual net metering settlement, but dirty panels lose output all year. Monthly cleaning, which is covered for five years under the Delhi scheme, keeps output steady.
What Mistakes Do Mayur Vihar Homeowners Commonly Make?
- Paying a full advance before BYPL feasibility or portal allotment.
- Relying on old subsidy figures. Many pages still quote ₹30,000 as the Delhi top-up or ₹1,08,000 as the total. The current figures are up to ₹78,000 from each government.
- Skipping roof consent in shared DDA blocks, which leads to disputes after installation.
- Over-sizing beyond 3 kW without checking whether extra units will just be paid at the lower APPC rate.
- Low structure height that blocks terrace use or makes cleaning hard. Ask for an elevated structure if you use the roof for drying clothes or storage.
- Ignoring sanctioned load. Your solar capacity is linked to your sanctioned load, so a load enhancement may be needed first.
Frequently Asked Questions
Which DISCOM handles rooftop solar net metering in Mayur Vihar Phase 1 Extension?
BSES Yamuna Power Limited (BYPL) handles Phase 1 Extension, just like Phase 1, 2 and 3. Your installer must be empanelled for BSES Yamuna, not BSES Rajdhani or Tata Power-DDL.
Can a tenant in Mayur Vihar apply for free rooftop solar?
The application is linked to the electricity connection (CA number) and needs permission to use the roof. A tenant would need the owner’s written consent, and since the system stays with the property, most tenants ask the owner to apply in their own name.
Will free solar stop my Delhi 200-unit free electricity?
No. Under the Delhi scheme, households up to 200 units keep their 100% electricity subsidy and also get an energy-saving incentive plus payment for surplus units. Households between 201 and 400 units keep their existing subsidy too.
Can I install a battery backup with subsidised rooftop solar?
The subsidy schemes cover grid-connected on-grid systems with net metering. You can ask the installer about a hybrid inverter so a battery can be added later, but the battery cost is not covered by the PM Surya Ghar or Delhi capital subsidy.
Is there a deadline to apply for the Delhi free rooftop solar scheme?
The first phase under the ULA framework covers about 1.10 lakh installations up to 28 February 2027 on a first-come, first-served basis, and PM Surya Ghar itself runs until 31 March 2027. Applying early improves your chances.
Can a Mayur Vihar society install solar for common areas and lifts?
Yes. A group housing society or RWA can install a common-area system with ₹18,000/kW central and up to ₹11,000/kW Delhi support, up to 3 kW per household and 500 kW total including individual installations. The cost usually goes into society maintenance savings for lifts, pumps and lighting.
Final Recommendation
If your BYPL bill shows an average of 400 units or less, do not buy a system from the open market yet. Register your consent on the Delhi Solar Portal first and let the allotted vendor install a 2 kW or 3 kW system at zero upfront cost. If you use more than 400 units, get quotes from two or three BYPL-empanelled installers close to your phase, insist on DCR panels and an itemised quote, and make sure the price you pay reflects the full ₹1,56,000 subsidy available on 3 kW. For the latest state subsidy rules and eligibility in one place, see our main Delhi solar subsidy guide.
1 thought on “Rooftop Solar Installers in Mayur Vihar Phase 1, 2 and 3, East Delhi: Free Solar Scheme, BYPL Process and How to Pick the Right Vendor (2026 Guide)”