For homes in Kalkaji and CR Park, the right solar company isn’t simply the one with the highest Google rating. You want a PM Surya Ghar registered vendor that already works with BSES Rajdhani (BRPL), handles net metering and both subsidies from start to finish, uses DCR (made-in-India) panels, and gives you a written, itemised quote with 5 years of maintenance included.
There’s also a big change many homeowners haven’t heard about yet. Since September 2026, Delhi has a free rooftop solar route for eligible homes, and on that route the company is assigned to you. So before you start calling installers, check which route fits your home. This guide covers both routes, current subsidy amounts, real costs, and the questions to ask any installer in South Delhi.
Quick Overview
- Your DISCOM: Kalkaji and CR Park are served by BSES Rajdhani Power Ltd (BRPL), so your installer must be familiar with BRPL’s net metering process.
- Central subsidy (PM Surya Ghar): ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, up to ₹78,000.
- Delhi state subsidy: The Delhi Solar Portal now lists up to ₹26,000 per kW for home plants up to 3 kW, so a maximum of ₹78,000.
- Free solar route (ULA model): Eligible households can get a 2 kW or 3 kW plant at no upfront cost. Your DISCOM or the state agency assigns the vendor.
- Choosing your own company: Best if you want a bigger system (above 3 kW), a hybrid or battery setup, a specific panel brand, or an elevated structure for your terrace.
- Benchmark cost: About ₹60,000 per kW up to 5 kW and about ₹55,000 per kW for 6 to 10 kW, before subsidy.
Which Solar Company Is Best for Homes in Kalkaji and CR Park?
The best solar company for your home is one that is registered on the PM Surya Ghar national portal, has completed BRPL net metering jobs in South Delhi, and puts every component, warranty, and service term in writing. Brand size matters less than paperwork and after-sales service.
Here’s why that matters locally. Most problems Kalkaji and CR Park homeowners run into aren’t panel failures. They’re stuck subsidy claims, net meter delays, and installers who vanish once the plant is commissioned. A smaller local company that answers the phone in year three is often a better choice than a big name that subcontracts your job.
What Should a Good Installer Offer?
| What to check | Why it matters | Red flag |
|---|---|---|
| PM Surya Ghar vendor registration | Only registered vendors can install subsidy-eligible plants | “We’ll apply the subsidy later” with no portal registration |
| BRPL net metering experience | Avoids rejected applications and long meter delays | No past BRPL jobs they can show you |
| DCR (domestic content) panels | Required for the central subsidy on home plants | Cheap imported panels on a “subsidy” quote |
| 5-year O&M included | PM Surya Ghar vendors must support maintenance for the first 5 years | AMC sold as an extra for the first years |
| Itemised written quote | Lets you compare installers properly | A single “per kW” number with no brand names |
| Earthing and lightning arrester | Safety for rooftops in a dense neighbourhood | Earthing listed as “as required” |
Pro Tip! Ask the company for the addresses of two or three plants they’ve installed near Kalkaji, Alaknanda, Greater Kailash, or CR Park. A real local installer will have them. Seeing a plant that has run for a year or two tells you more than any website review.
Which Local Installers Show Up Most Often?
When people search for solar companies near Kalkaji and CR Park, these South Delhi installers appear most often in Google’s local results. Ratings below are from Google listings as of November 2026 and change over time. This is not an endorsement, so check each company against the official vendor list before you sign anything.
| Company | Base area | Google rating (Nov 2026) |
|---|---|---|
| Saweri Urja Pvt. Ltd. | New Delhi | 4.9 (194 reviews) |
| Thermosun Engineering and Power India Pvt. Ltd. | Savitri Nagar / Sheikh Sarai | 4.8 (137 reviews) |
| GeoPower India Pvt. Ltd. | Malviya Nagar | 4.7 (213 reviews) |
| Sakshine Solar Energy Solutions Pvt. Ltd. | Okhla Phase II | 4.3 (62 reviews) |
Important Point to be Considered! Some shops that rank for “solar” near Kalkaji, such as inverter and battery dealers in local markets, mainly sell backup equipment. They aren’t always registered rooftop solar vendors. If you want the subsidy, confirm registration first.
If you’re comparing installers across nearby areas, our guide to solar panel installation in Lajpat Nagar covers many of the same South Delhi companies and checks.
Do You Even Need to Choose a Solar Company Now?
Maybe not. Under Delhi’s free rooftop solar scheme, eligible homes get a 2 kW or 3 kW plant through the Utility-Led Aggregation (ULA) model. On this route, the DISCOM or the state agency picks the vendor through tendering, so you don’t hire one yourself.
The Delhi Solar Energy Policy 2023 (Second Amendment) was notified on 17 September 2026. The Delhi Solar Portal says households with average consumption below 400 units a month can get a plant installed free of cost by the Delhi government, and group housing societies are eligible too. Reports on the scheme say places are limited to around 2.2 lakh homes on a first-come, first-served basis, with applications closing on 28 February 2027.
Free ULA Route vs Choosing Your Own Installer
| Point | Free ULA / DISCOM route | Your own registered vendor |
|---|---|---|
| Who picks the company | DISCOM or state agency | You |
| System size | 2 kW or 3 kW | Any size your roof and sanctioned load allow |
| Upfront cost | Zero for eligible homes | Project cost minus applicable subsidies |
| Panel and inverter brand | Set by the tender | Your choice |
| Elevated structure or hybrid setup | Usually standard design only | Possible |
| Best for | Homes under about 400 units a month | Large builder floors, bungalows, high bills, shops |
Pro Tip! Check your last 12 BRPL bills before deciding. If your average is well under 400 units and a 3 kW plant covers your usage, the free route is hard to beat. If you run three or four ACs in summer and your bill often crosses 600 to 800 units, you’ll probably want a 5 kW or larger plant from an installer you choose.
Important Point to be Considered! Apply only through the official Delhi Solar Portal (solar.delhi.gov.in). Agents going door to door in CR Park or Kalkaji asking for a “registration fee” for the free scheme aren’t part of the official process.
How Much Does Solar Installation Cost in Kalkaji and CR Park?
Using Delhi’s benchmark rates, a 3 kW home plant costs about ₹1.8 lakh before subsidy. After central and state subsidies, that drops to roughly ₹24,000. The Delhi Solar Portal’s calculator lists about ₹60,000 per kW up to 5 kW, ₹55,000 per kW for 6 to 10 kW, and ₹50,000 per kW above 10 kW.
| System size | Benchmark cost | Central subsidy | Delhi subsidy (max) | Approx. cost after subsidy |
|---|---|---|---|---|
| 1 kW | ₹60,000 | ₹30,000 | ₹26,000 | ₹4,000 |
| 2 kW | ₹1,20,000 | ₹60,000 | ₹52,000 | ₹8,000 |
| 3 kW | ₹1,80,000 | ₹78,000 | ₹78,000 | ₹24,000 |
| 5 kW | ₹3,00,000 | ₹78,000 | ₹78,000 | ₹1,44,000 |
| 10 kW | ₹5,50,000 | ₹78,000 | ₹78,000 | ₹3,94,000 |
These are benchmark figures, not quotes. Real prices in South Delhi often come in higher if you choose premium TOPCon panels, a raised structure so you can still use the terrace, longer cable runs, or a hybrid inverter with batteries. The state subsidy is also limited by the actual project cost, so a cheaper plant may not get the full amount.
For a full price breakdown by component, see our guide on rooftop solar installation cost for a home in Delhi. If you’re leaning towards the most popular size, this detailed look at the 3 kW rooftop solar system cost after subsidy walks through the math.
Important Point to be Considered! Many older blogs still promise ₹2 to ₹3 per unit Generation Based Incentive (GBI) on top of the subsidy. Commentary on the September 2026 amendment says GBI is being folded into the bigger upfront subsidy for new home plants. Don’t count GBI in your payback unless the portal confirms it for your application.
How Much Subsidy Can You Get in Kalkaji and CR Park?
You can get up to ₹1,56,000 in total: up to ₹78,000 from the central PM Surya Ghar scheme and up to ₹78,000 from the Delhi government for a 3 kW home plant. Both subsidies stop rising at 3 kW, so a 5 kW or 10 kW plant gets the same maximum.
- Central (PM Surya Ghar): ₹30,000 per kW for 1 to 2 kW, plus ₹18,000 for the third kW.
- Delhi state: Up to ₹26,000 per kW for plants up to 3 kW, as listed on the Delhi Solar Portal’s state subsidy page.
- Housing societies and RWAs: ₹18,000 per kW central support for common facilities, including EV charging, plus ₹11,000 per kWp state support listed on the portal.
The eligibility rules, the latest amendment, and how the money is paid are explained in our complete Delhi solar subsidy guide.
What Size Solar System Does Your Kalkaji or CR Park Home Need?
Most homes using 150 to 300 units a month need a 2 kW to 3 kW plant. In Delhi, each kW usually generates around 100 to 140 units a month, depending on shading, panel angle, and the season.
| Average monthly bill (units) | Suggested size | Typical home |
|---|---|---|
| Up to 150 | 1 to 2 kW | DDA flat, small family |
| 150 to 300 | 2 to 3 kW | 2 to 3 BHK builder floor |
| 300 to 600 | 3 to 5 kW | Larger floor with 2 to 3 ACs |
| 600 and above | 5 to 10 kW | Independent house or full building |
A shadow-free roof needs roughly 10 square metres (about 100 sq ft) per kW. In CR Park, tall trees, water tanks, and taller neighbouring floors often cut that usable area. A good installer will do a proper shadow check at the site survey rather than just measuring your roof.
What Is the 20% Rule for Solar?
The 20% rule is a common sizing guideline: design your plant to produce about 20% more electricity than your average use. It’s not an official rule. In Delhi, this buffer helps cover hazy winter months, dust on panels, and future loads like an EV charger or an extra AC.
There’s one limit to keep in mind. Your plant size usually can’t go beyond your sanctioned load with BRPL. If you want a bigger plant, ask your installer about a load enhancement first.
Can You Install Solar on a Builder Floor in CR Park or a DDA Flat in Kalkaji?
Yes, but roof rights are the first thing to settle. In a builder floor, the terrace usually belongs to the top-floor owner or is shared under the sale deed. Whoever applies needs a separate electricity connection in their name and the legal right to use that roof space.
- Builder floors (common in CR Park blocks): Get a written no-objection from the other floor owners if the terrace is shared. Each floor can have its own plant on a separate meter if roof space allows.
- DDA flats in Kalkaji pockets: Individual flats often lack a private roof. The better route is usually a society or RWA plant for common areas, or a group or virtual net metering setup, if your RWA agrees.
- Independent houses and kothis: The simplest case. Your installer can size for the whole building load.
- Shops and offices near Kalkaji, Nehru Place, or Okhla: Commercial connections don’t get the home subsidy, so compare on cost per unit and payback instead.
Pro Tip! If you host terrace gatherings or dry clothes on the roof, ask for an elevated structure with the lowest panel edge about 7 to 8 feet high. It costs more, but you keep your terrace usable and the panels stay clear of water tank shadows.
How Do You Compare Solar Quotes From Different Installers?
Compare quotes component by component, not by the final per-kW price. Two quotes that both say “₹65,000 per kW” can hide very different panels, inverters, and structures.
Ask every installer to list these items in writing:
- Panel brand, wattage, type (TOPCon, mono PERC), and DCR status
- Inverter brand, rating, and warranty period
- Mounting structure material (hot-dip galvanised steel or aluminium) and height
- ACDB and DCDB protection boxes, cable size, and brand
- Earthing pits and lightning arrester
- Net metering, subsidy filing, and DISCOM charges, and who pays them
- O&M terms for the first 5 years and the cost after that
- Payment schedule tied to milestones, not full payment upfront
Our step-by-step guide on how to compare rooftop solar quotations includes a ready checklist you can take to every site visit.
Important Point to be Considered! According to the BSES rooftop solar FAQ, panels typically last about 25 years and inverters about 10 to 12 years. Plan for at least one inverter replacement and ask installers what that will cost.
How Does the Installation Process Work With BSES Rajdhani?
The process starts with an application on the PM Surya Ghar portal, then a feasibility check by BRPL, installation by your vendor, a net meter installed by BRPL, inspection, and finally subsidy release to your bank account. A good installer handles most of these steps for you.
- Register and apply: Sign up on the national portal with your BRPL CA number.
- Feasibility approval: BRPL checks your connection and sanctioned load.
- Site survey and installation: Your chosen vendor installs the plant.
- Net metering: BRPL installs a bidirectional meter after the paperwork is approved.
- Inspection and commissioning: The plant is verified and commissioned on the portal.
- Subsidy release: You submit bank details, and the subsidy is credited after verification.
If you live in an independent house, the full rooftop solar installation process for an independent house explains each stage and typical timelines. You can also apply for the solar subsidy online yourself if you’d like to track it directly.
Which Documents Will Your Installer Ask For?
Keep your latest BRPL bill, an ID proof, proof of ownership or roof rights, a cancelled cheque or bank passbook, and your roof photos ready. Delays in Kalkaji and CR Park usually come from a name mismatch between the bill and property papers.
Check the full list of documents required for the solar subsidy, and separately the documents needed for net metering, since BRPL asks for its own set. For the DISCOM side, our guide to the BSES net metering application process covers forms, fees, and follow-up.
On-Grid, Hybrid, or Off-Grid: Which Is Better for South Delhi Homes?
On-grid is the best choice for most homes in Kalkaji and CR Park. It’s the cheapest, qualifies for the subsidy, and uses net metering to cut your bill. Choose hybrid only if power cuts in your block are frequent and you need backup.
- On-grid: No batteries. The plant shuts down during a power cut for safety. Lowest cost and best payback.
- Hybrid: Adds batteries for backup. Subsidy covers the plant, but batteries don’t add to it. Higher cost and battery replacement every few years.
- Off-grid: Rarely makes sense in a grid-connected colony like CR Park or Kalkaji.
Common Mistakes Kalkaji and CR Park Homeowners Make
- Choosing on price alone: The cheapest quote often uses thin structures or skips earthing.
- Paying 100% upfront: Tie payments to milestones like material delivery, installation, and net meter installation.
- Ignoring shade: One water tank shadow can cut a whole string’s output.
- Not checking roof rights: This is the top reason builder floor applications get stuck.
- Missing the free scheme: Paying a private installer for a 3 kW plant when your home qualifies for the free route.
- Trusting outdated subsidy figures: Many sites still show older Delhi subsidy amounts. Always check the official portal.
Frequently Asked Questions
Who is the best company to install solar panels in CR Park?
There’s no single best company for everyone. The right pick is a PM Surya Ghar registered vendor with past BRPL jobs in CR Park or nearby blocks, an itemised quote, and 5-year O&M included. Shortlist three, visit one of their working plants, and compare written quotes.
Is the free solar scheme available in Kalkaji?
Yes, Kalkaji homes on BRPL connections can apply through the consumer consent form on the Delhi Solar Portal. Eligibility depends on your average consumption and roof feasibility, and places are limited, so apply early if you qualify.
Can I choose my own solar company under the free scheme?
No. Under the ULA model, the DISCOM or the state agency assigns the vendor. If you want to pick your own installer, panel brand, or a bigger system, go through a registered vendor on the regular PM Surya Ghar route.
How long does solar installation take in Kalkaji and CR Park?
The physical installation of a 3 to 5 kW plant usually takes 1 to 3 days. The full process, including approvals, net meter installation, and subsidy release, often takes several weeks. Most of the wait is paperwork, not installation.
Do solar panels work well in Delhi winters and smog?
They work, but output drops on hazy winter days. Summer months produce much more, and net metering balances this across the year. Regular cleaning matters a lot in South Delhi because dust and smog film reduce output.
Can a shop or office in Kalkaji get the solar subsidy?
No, commercial and industrial connections aren’t eligible for the residential PM Surya Ghar subsidy. Solar can still pay off for shops and offices because commercial tariffs are higher, so the savings per unit are bigger.
Final Recommendation
Start with your BRPL bills. If you use under about 400 units a month and a 2 or 3 kW plant is enough, apply for Delhi’s free rooftop solar route on the official portal before places run out. If your usage is higher, your terrace needs an elevated structure, or you want backup, get three written quotes from PM Surya Ghar registered installers who have done BRPL net metering jobs near Kalkaji or CR Park. Compare them line by line, visit one working plant, and sign only when the subsidy, net metering, and 5-year maintenance are all in writing.