Government Approved Solar Vendors in Saket and Malviya Nagar Delhi: How to Find, Verify and Choose the Right One

Saket and Malviya Nagar get their electricity from BSES Rajdhani Power Limited (BRPL). So a government approved solar vendor for your home is one that is registered on the PM Surya Ghar national portal under BRPL. You need a vendor from this list to claim the central subsidy of up to ₹78,000. In Delhi, that subsidy now comes with a state top-up of up to ₹78,000 for systems up to 3 kW.

The vendor list is not the only thing to know. Delhi now has two ways to get rooftop solar. In the first, you pick a vendor yourself. In the second, the government picks one for you through a tender. This guide covers both, how to check any vendor in a few minutes, and the problems that come up most often with DDA flats, builder floors and shared roofs in South Delhi. Once a vendor is verified, you are protected on subsidy, quality and five years of free maintenance.

In This Articles

Quick Overview

Question Short Answer
Which DISCOM covers Saket and Malviya Nagar? BSES Rajdhani Power Limited (BRPL), South Delhi
Where is the official vendor list? pmsuryaghar.gov.in, under BRPL, also linked on solar.delhi.gov.in
Is an approved vendor mandatory? Yes, if you want the PM Surya Ghar central subsidy
Total subsidy for a 3 kW system Up to ₹78,000 central + up to ₹78,000 Delhi state = up to ₹1.56 lakh
Free solar option For homes averaging up to 400 units a month. Vendors are picked by IPGCL through a tender
Panels that qualify DCR modules on ALMM List-I, made with cells from ALMM List-II (projects commissioned from 1 June 2026)
Free maintenance 5 years, included by the vendor

What Does “Government Approved Solar Vendor” Actually Mean in Delhi?

A government approved solar vendor is a company registered on the PM Surya Ghar national portal by your DISCOM. In Saket and Malviya Nagar, that DISCOM is BRPL. Only these registered vendors can install systems that qualify for the central subsidy.

People use many words for this. “Empanelled vendor”, “MNRE approved installer”, “BSES approved solar company” and “PM Surya Ghar registered vendor” usually mean the same thing. What matters is whether the company’s exact legal name shows up on the portal list for BRPL.

Here is what registration means in practice:

  • The DISCOM has accepted the vendor’s documents and the bank guarantee that MNRE rules require.
  • The vendor has agreed to scheme rules, such as using DCR panels, uploading installation documents and giving 5 years of free maintenance.
  • The vendor can be penalised or removed from the list if it breaks those rules. That gives you a complaint route that an unregistered installer does not.

Important Point to be Considered! A shop board that says “Govt Approved” or “MNRE Approved” proves nothing. Many local installers in Saket District Centre, Malviya Nagar market and Khirki Extension use these words in their ads. Always check the portal yourself.

Which Electricity Company Covers Saket and Malviya Nagar?

Saket, Malviya Nagar and the colonies around them are served by BSES Rajdhani Power Limited. Malviya Nagar comes under BRPL’s Saket division. That means you check the BRPL vendor list, not the BYPL or Tata Power list.

This holds for most nearby localities too, including Sheikh Sarai, Shivalik, Panchsheel, Hauz Rani, Pushp Vihar, Press Enclave, Saidulajab, Khirki Extension and Chirag Dilli. If you are not sure, look at the top of your electricity bill. It shows the DISCOM name and your 9-digit CA number. You will need that number for every solar application.

If your bill says NDMC or MES, you are in a different list. Those areas have their own vendor pages on the Delhi Solar Portal.

How Do You Check If a Solar Vendor Is Registered on PM Surya Ghar for BRPL?

Open the BRPL vendor list on pmsuryaghar.gov.in and search for the company’s exact legal name. The whole check takes about 10 minutes. Here is how to do it step by step:

  1. Go to the Delhi Solar Portal at solar.delhi.gov.in empanelled vendors page. It has a direct link to the BRPL list on the PM Surya Ghar portal.
  2. Or use the national portal. Go to pmsuryaghar.gov.in, open the vendor section, and choose NCT of Delhi and BSES Rajdhani Power Limited.
  3. Ask the vendor for its legal company name as it appears on its GST certificate. Brand names often differ from registered names.
  4. Search the list for that name. Note the registration details and the districts the vendor has chosen to serve.
  5. Match the GST number on the quotation with the one linked to the company. A mismatch is a warning sign.
  6. Look at the vendor rating if the portal shows one. MNRE rates registered vendors based on their installation record.

Pro Tip! Take a screenshot of the vendor’s entry on the portal with the date visible. Vendor registrations are renewed from time to time. If a dispute comes up later, you will have proof that the vendor was registered when you signed.

What If the Vendor Is Registered in Another State?

A vendor registered in another state can still work in Delhi. Under MNRE rules, a registered vendor can install in any district. It just chooses which states and districts to show up in. If a Gurugram or Noida company quotes for your Saket house, check that it is listed for BRPL and that it has a service team close by. Five years of free maintenance means little if the technician takes a week to come.

What Are the Two Ways to Get Rooftop Solar in Saket and Malviya Nagar Right Now?

Delhi now has two routes. In the open route, you choose a registered vendor yourself. In the government aggregation route, the Delhi government picks vendors through IPGCL and gives households who qualify a system of up to 3 kW at no upfront cost. Here is how they compare:

Point Open Route (You Choose) Free Solar Route (IPGCL Tender)
Who picks the vendor You, from the BRPL list on PM Surya Ghar IPGCL through competitive bidding, allotted by DISCOM division
Who can apply Any residential BRPL consumer Homes averaging up to 400 units a month (based on FY 2025-26)
System size Sized to your roof and load, up to 10 kW for residential 2 kW or 3 kW
Price Agreed between you and the vendor Set by the tender, with the gap covered by the Delhi government
Panel brand choice Yes, within DCR rules Not in your control
Status (late November 2026) Open now Registrations open, vendor tender still being finalised

The Delhi PM Surya Ghar registration portal opened on 21 September 2026. As of mid-November 2026, BRPL areas had received more than 51,000 applications, the highest of the three DISCOMs. The vendor tender was still being finalised. Until IPGCL announces the selected vendors, no private company can honestly say it is “the government vendor” for free solar in your division.

Important Point to be Considered! If someone calls or comes to your door saying they are the official vendor for the free solar scheme and asks for a booking fee, do not pay. Under the free route, vendors are allotted through the DISCOM. You do not book them privately.

Which Route Should You Pick?

Your bill and your roof decide this. The free route makes sense if you use up to 400 units a month, need only 2 to 3 kW, and can wait for the tender and allotment. The open route is better if you use more power, want a 5 kW or larger system, want to choose your panel and inverter brand, or simply do not want to wait.

Homes that already have more than 1 kW installed on the same account are reported to be outside the free route. They can still use the open route.

How Much Subsidy Do You Get With an Approved Vendor in Delhi?

For a 3 kW system, you can get up to ₹78,000 from the Centre and up to ₹78,000 from the Delhi government. That is up to ₹1.56 lakh in total. The central amount is fixed by capacity. The state amount is listed at up to ₹26,000 per kW for systems up to 3 kW.

System Size Central Subsidy (PM Surya Ghar) Delhi State Subsidy (max)
1 kW ₹30,000 Up to ₹26,000
2 kW ₹60,000 Up to ₹52,000
3 kW ₹78,000 Up to ₹78,000
Above 3 kW (up to 10 kW) ₹78,000 (capped) No additional state subsidy

Under the tender model, the state subsidy is the lower of two amounts: the tender cost minus the central subsidy, or ₹26,000 per kW. It is capped at ₹78,000. The portal does not clearly say whether open route installations get the full ₹26,000 per kW. Before you sign, ask your vendor to show you the current state subsidy amount on solar.delhi.gov.in.

For the full breakdown of central and state amounts, read our guide on the Delhi solar subsidy. To see what you actually pay for the most common size, check the 3 kW rooftop solar system cost after subsidy in Delhi.

Pro Tip! Older articles still quote ₹2,000 per kW (capped at ₹10,000) or ₹10,000 per kW (capped at ₹30,000) as the Delhi subsidy. Both are out of date. If a vendor’s quotation uses these numbers, the quote was probably made from an old template.

Which Solar Panels Must an Approved Vendor Use for Subsidy?

Your vendor must use DCR panels made in India from Indian solar cells. Since 1 June 2026, these must be ALMM List-I modules that use cells from ALMM List-II. If the system uses non-DCR panels in any form, it is not eligible for the central subsidy.

Ask for these documents before installation:

  • DCR certificate for the exact panel serial numbers being installed
  • ALMM model number of the panels, which you can match on the MNRE ALMM list
  • Inverter details showing it meets the Quality Control Order and can send data through a SIM or dongle
  • Datasheets for the panels, inverter and mounting structure

There is one exception. If you choose the “Give It Up” option and skip the central subsidy, MNRE allows non-DCR modules until 31 March 2027. Few homeowners in Saket or Malviya Nagar would choose this, because the subsidy is worth far more than the small price difference.

What Must Every Approved Vendor Give You Under PM Surya Ghar?

A registered vendor in the open route must give you 5 years of free repairs and maintenance, along with a 5-year system warranty. The vendor must also meet set technical standards. These are not extras you need to bargain for. They are part of the scheme.

Check that your agreement covers:

  • 5 years of free comprehensive maintenance, including visits and replacing faulty parts
  • A performance ratio of at least 75% at commissioning, kept up through the warranty period
  • A shadow analysis report for your roof
  • A radiation sensor with a valid calibration certificate
  • Uploading all technical documents on the portal so your subsidy can be released
  • Panel warranty (usually 25 years on performance) and inverter warranty, stated in writing

When you compare offers, line up these points side by side, not just the price. Our guide on how to compare rooftop solar quotations in Delhi has a simple checklist for this.

How Much Does an Approved Vendor Charge in Saket and Malviya Nagar?

Prices vary by system size, panel brand, structure height and roof type. In 2025, Delhi government officials put the cost of a 3 kW plant at around ₹2.25 lakh. Since the ALMM List-II rule started in June 2026, many vendors have raised DCR panel prices. So always get fresh quotes.

A few things push costs up in South Delhi homes:

  • Elevated structures over water tanks or terrace gardens in Panchsheel and Shivalik kothis
  • Long cable runs in four-storey builder floors where the meter is on the ground floor
  • Shading from neighbouring floors, trees or mobile towers, which may need more panels or optimisers

For a full cost picture by system size, see our guide on rooftop solar installation cost for homes in Delhi.

Can You Install Solar on a DDA Flat or Builder Floor in Saket and Malviya Nagar?

Yes, but only if you have clear rights to the roof space you plan to use. This is the most common problem in these areas. Many homes here are DDA flats or builder floors with shared terraces, so the roof question comes before the vendor question.

Independent Houses and Kothis

Houses in Panchsheel Park, Shivalik and parts of Malviya Nagar usually have one owner and a full roof. These are the easiest to do. The vendor does a site survey, you apply on the portal, and work moves ahead. Our rooftop solar installation process for independent houses in Delhi walks through each stage.

Builder Floors With a Shared Terrace

In a builder floor, the top floor owner often has roof rights. Ground and middle floor owners may not. Before you pay any advance, settle these points in writing:

  • Who owns or has use rights to the terrace, as per the sale deed
  • Written consent from the other owners if the terrace is shared
  • Which electricity connection the system will be linked to, since net metering works on one CA number
  • Whether the panel space is split between floors, so each owner can get their own system

DDA Flats and Group Housing

In DDA pockets such as Saket J Block, Malviya Nagar DDA flats and Sheikh Sarai, the roof is usually common property. Two options often work here. The RWA can install a system for common areas like lifts, pumps and lights. Or individual flat owners can get roof space allotted with the RWA’s approval. The Delhi portal lists a proposed subsidy for GHS and RWA common facilities of ₹11,000 per kWp, up to 500 kWp, sized at 3 kWp per house.

Important Point to be Considered! A registered vendor cannot fix a roof ownership dispute. If a neighbour objects after installation, you can end up removing the system, and the subsidy will not cover that. Sort out consent first.

What Documents Will an Approved Vendor Ask For?

You will need your latest BRPL electricity bill with the CA number, proof of ownership or authorisation for the property, Aadhaar, a bank account linked to your name for the subsidy, and a cancelled cheque or passbook copy. The vendor adds technical papers such as the DCR certificate and site photos.

For the full list, see the documents required for solar subsidy in Delhi. Net metering needs its own set, covered in our guide on documents required for solar net metering in Delhi.

How Does the Process Work After You Choose a Vendor?

You apply on the portal, BRPL checks feasibility, the vendor installs, BRPL fits the net meter and inspects the system, and then the subsidy goes to your bank account. Under Delhi’s revised policy, the net metering process has been cut from up to 75 days to 25 days. Registration charges are also waived for residential systems up to 10 kW.

  1. Register on pmsuryaghar.gov.in or solar.delhi.gov.in using your BRPL CA number. Our step-by-step guide on how to apply for solar subsidy in Delhi online covers every screen.
  2. Choose your vendor from the BRPL list and get a site survey done.
  3. Feasibility approval from BRPL.
  4. Installation by the vendor, using DCR panels.
  5. Net meter application and installation by BRPL. See the BSES solar net metering application process for homes for this step.
  6. Inspection and commissioning, followed by the vendor uploading documents.
  7. Subsidy release to your bank account.

If your file seems stuck at any stage, you can check your Delhi solar portal application status to see where it is waiting.

What Are the Red Flags When Picking a Solar Vendor in South Delhi?

The biggest red flags are a vendor not on the BRPL list, an unusually large advance, vague panel details, and promises of subsidy amounts that do not match the official portal. Walk away if you see any of the warning signs below.

  • “We’ll register later” or “we use a partner’s registration.” The vendor named on your application must be the registered one.
  • Asking for full payment before installation. Reputable vendors take staged payments linked to milestones.
  • “Subsidy guaranteed in 7 days.” Subsidy depends on inspection and document upload. No vendor controls the timeline.
  • No DCR certificate or ALMM model number on the quotation.
  • Quoting old subsidy figures or a “free solar” offer that skips the DISCOM.
  • No local service contact for the 5-year maintenance period.
  • Pressure to decide today because of a “scheme deadline”.

Pro Tip! Get at least three quotes from vendors on the BRPL list. Ask each one for the address and contact of a recent installation in Saket, Malviya Nagar or a nearby colony. A five-minute chat with that homeowner tells you more than any brochure.

What Happens If Your Vendor Disappears or Is Removed From the List?

If a registered vendor stops responding or is removed from the portal, your installed system and any subsidy already released are not cancelled automatically. Your maintenance support can suffer, though. Complain on the PM Surya Ghar portal and to BRPL. Keep copies of your agreement, invoice, DCR certificate and portal screenshots.

If your complaint is not resolved, BRPL consumers can approach the Consumer Grievance Redressal Forum (CGRF-BRPL) at Pushp Vihar, near Saket Court. This is one big reason to stick to registered vendors. Unregistered installers leave you with no scheme-level route at all.

Frequently Asked Questions

Is there a separate BSES Rajdhani solar vendor list for Saket only?

No. BRPL keeps one vendor list for its whole service area on the PM Surya Ghar portal. Any vendor on that list can install in Saket or Malviya Nagar. Locality-wise “approved vendor lists” shared on WhatsApp or private websites are not official.

Can I choose my own vendor under the Delhi free solar scheme?

No. Under the free route for homes using up to 400 units a month, IPGCL selects vendors through a tender and allots them by DISCOM division. If you want to choose your own vendor, use the open route. You pay the vendor’s price minus the subsidies.

Do I lose the subsidy if my vendor is not on the PM Surya Ghar list?

Yes, you lose the central subsidy. The Delhi Solar Portal says you must use a PM Surya Ghar registered vendor to claim it. Outside the scheme, you can hire any installer, and the Delhi subsidy and incentive apply to net-metered systems under their categories. You give up the larger central amount, though.

Is a 5 kW system worth it in a Malviya Nagar house with high bills?

It can be, if your roof has space and your use is well above 400 units a month. Keep in mind that both the central and Delhi subsidies stop at 3 kW. You pay full price for the extra 2 kW, but the saving on high-slab units usually makes up for it over time.

Can a tenant in Saket install rooftop solar with an approved vendor?

Only with the owner’s written consent, and only if the electricity connection and roof rights allow it. The subsidy goes to the account linked to the registered consumer. If the bill is in the owner’s name, the owner usually has to apply.

How long does it take to get a vendor and finish installation in South Delhi?

Under the open route, most homes get feasibility, installation and net metering done within one to two months, depending on BRPL inspection slots. Under the free route, vendor allotment depends on when the IPGCL tender is finalised. That had not happened as of late November 2026.

Final Recommendation

If you live in Saket, Malviya Nagar or a nearby South Delhi colony, start by checking your BRPL bill and your average monthly units. If you use up to 400 units and are happy with 2 to 3 kW, register for the free route on solar.delhi.gov.in and wait for the official vendor allotment. Do not pay anyone who claims to be the government vendor before that.

If you use more power or want control over brands and size, pick three vendors from the BRPL list on pmsuryaghar.gov.in. Check their names and GST numbers, ask for DCR proof, and compare quotes on warranty and service, not just price. Settle roof rights with your neighbours or RWA first. A verified vendor and a clear roof are what get you the full ₹1.56 lakh and a system that runs smoothly for 25 years.